The rubbish from the building place has been taken away by 24 trucks, the old plastering has been removed and the cellar walls have been covered with a new layer of plaster. The old wiring and heating systems have been dismantled. Everything has been antisepted. The inner space has been designed according to the teachers’ wishes. Some of the walls have been dismantled, new partitions have been erected.
After examining the roofing we noticed that it needed to be changed. New lumber has been bought and delivered. Now the roofing has been dismantled. It’s planned to be covered with trapezoid sheet.